2012
Turku, dockyard shore. Water jet cutting and jacketing of pile, water jet cutting of lower beams and dismantling of retaining wall Haugesund, Norway. Cutting of sonar pole of support platform M/S Stril Merkuri. Haugesund, Norway. Pile dock. Quarry, drilling of adhesion, lowering and pouring of pile. Helsinki, Kalasatama. Erosian slab, footing on bridge (2), footing on high voltage pole (2), flashing on expansion joints on support wall Espoo, bridge of Kivenlahti, dismantling of molds Finnish port cities, washing of bottoms of cruise ships and cargo ships Helsinki, Katajanokka EK7 erosion slabs Helsinki, Kellosaari, replacement of condensation pipes of power plants, lead-throughs for new pipes, installation of temporary pipes
2011
Oskarshamn, Swedish. Concrete and installation work of condensation tunnel, nuclear power plant Simpevarp. Mättä, Metsä Tissue, underwater service of freshwater pump Underwater service of Harjavalta power plant. Käsnäs, dismantling of work bridge. Loviisa, channel service dives Kemi, isohaara power plant, construction of fish ladder Finnish port cities, washing of cruise ships and cargo ships. Utsjoki, widening of bridge/current pillars Helsinki, länsi-satama. Jacketing of piles. Espoo. Bridge of Kivenlahti. Turku, shipyard shore. Jacketing of piles, repair of log dock, water jet cutting of lower beams of dock Haugesund, Norway. Formwork and pouring of pile footing of ship dock, installation of piles etc… Rotterdam, Holland. Offshore safety course.
2010
Kemi, Isohaara power plant. Replacement of frames of hatches, replacement of bolts of flood hatches. Helsinki, länsi-satama. Jacketing of piles. Käsnäs/Lövön bridge, supporting of work bridge, leveling quarry work of bottom of shore footing, formwork-rebar work of footing of bridge pillar, airlift pumping and inspection of digging piles, pouring of digger piles. Raahe, Ruukki’s deep harbor, erosion slab Turku, Port of Turku, survey of harbor basin, installation of bubbler pipe Turku, repair of underwater pumping station of Maaria basin Finnish port cities, washing of bottoms of cruise ships and cargo ships Reposaari, kemira, washing of discharge pipe Myllykoski, Hyytöpuomi, Pato Osakeyhtiö Saaristomeri, channel service dives Turku, welding of protective grounding of Port of Turku Mäntyluoto, erosion slab, repair of retaining wall Vampula/Huittinen, Settipadot, Sallila power plant Sastamala, Tyrvä power plant, inspection dives, replacement and cleaning of screens Sastamala, Äetsä power plant, inspection dives Kokemäki, Kolsi power plant, inspection dives and cleaning Pansio, inspection and cleaning of rails of shipyard Harjavalta, Harjavalta power plant, inspection dives Haugesund, Bergen, Norway. Installation of channel markers new construction docks, bottom inspection of ship. Tehnip Norway offshore diving project.
2009
Pyhämaa, Cabling of Mannervesi Särkisalo, repair of Omya ship dock Pyhämaa, installation of electrode network of Laitakari Rymättylä/Naantali, new dock of Maisaari Kristiinankaupunki, construction of barrier dam Naantali, port of Naantali, repair of wall structures of dock Finnish port cities, washing of bottoms of cruise ships and cargo ships/ Länsi-Turunmaa, lifting of work ferry from bottom 40 m Turku, diving work of City of Turku Kemi, isohaara power plant, replacement of hatch flashing Varkaus, Stora Enso, repair of discharge pipe and replacement of support trestles Korppoo/Länsi-Turunmaa, inspections of footings, Wattkasti bridge Salo, water pipe and pressure sewer, Vuohisaari-Lehtiniemi Naantali, nesteoil, oil harbor. Support of dock. Turku, Inspection of Aurasilta shore walls and current pillars Rovaniemi, Kemijoki Oy. Cleaning of screens of power plants. Langevåg, Norway. Rear gate Kvitsöy, Norway. Pile dock. Technip Norway, Offshore diving project. Norway, Bergen University Gollege CSWIP 3.1 U. Underwater Inspector.
2008
Kokemäki, Kolsi power plant. Dismantling of barrier hatch and construction of new one. Loviisa, Valko port. Renovation of oblique dock Turku, bridge ferry port, pouring of pile footings, planking of rear gate, dismantling of beams, cutting of piles. Kotka, Dismantling of pouring supports of new dock of harbor Uusikaupunki, dismantling of pouring supports and trusses of harbor dock and dolphin Kökar, dismantling work of dock structures Lapland, inspection dives of Kemijoki power plants Pori, concrete samples of Chemical dock, Tahkaluoto Naantali. Repair of Suurlauttapaikka. Haugesund, Norway. Pile dock. Quarry, adhesions, lowering of and pouring if piles. Technip Norway, Offshore diving project. RUE Norway, installation of Huldra Spudcans onto West Epsilo oil drilling platform.
2007
Kökar, Åland. Connecting vessel dock. Hanko, underwater dismantling of bottom support beams of new dolphin. Helsinki, länsisatama. Beam construction to level and pouring of erosion slab Koverhar, coal harbor, repair of torn retaining wall of dock Cutting of work piles of 1 highway’s current pillars. Ii, power plants, replacement of screens and repair work Maaninka, viannankoski, construction of work dam Upinniemi, missile boat dock, erosion slab Turku, harbor, inspection of two beacons Espoo, pitkäjärvi, weighting and inspection of pipe Helsinki, santahamina-isosaari-kuivasaari-harmaja, inspection and patching of water pipes repair/resealing and pouring of sealing pour of Highway 1 Helsinki, Santahamina, weighting of sewer pipe Muurla-Lohja, bridge s203 cutting of work piles Norway, top-up bell diving course and training for hot water suits Norwich, England. Offshore safety course.
2006
Porvoo, öljysatama. Inspections of harbors 7/8, inspection and repair of groundings of piers, weighting of water pipe. Somero, heating elements, dam of Hovirannankoski Naantali, Concrete pontoons Kemi, isohaara power plant, dam inspection Saarijärvi, repair work of power plant Loviisa, deepening of channel. Drilling and quarry of rock tips Bergen, Norway. Training for wet bell and hot suit Helsinki, länsi-satama. Jacketing of piles. Helsinki, länsi-satama, dismantling of dolphin (2) Turku, Aurajoki. Study of wall structures. Helsinki, länsi-satama. Erosion slab. France, INNP Institut National De Plongee Professionelle) Surface supplied top-up Air Diver.
2005
Maarianhamina, länsi-satama. Dock 6. Naantali, city shore. Buoys on water pipe. Perno, Construction of dock of shipyard. Pori, Lukkari bridge. Lead-throughs of forms of current pillars to piles, pours, dismantling of form. Turku, water supply pumps for Lepola garden. Lifting, replacement and lowering of pumps. Turku, Akerfinnyards. Loading dock. Turku, Pouring of erosion slab for Viking line Naantali, RO-RO ferry location. Erosian slab.
2004
Maarianhamina, länsi-satama. Dock 6. Porvoo, oil harbor. Inspection of water pipe, lifting, repair and lowering of water pipe, videotaping of the inspection of main dock, dismantling of beams and planking of main dock. Hirvensalo, Turku. Element dock. Lowering of elements. Savonlinna, drilling, forming and pouring work of dolphin of Olavinlinna’s ship port. Saarijärvi, Installation of screens of power plant and clearance work of underside.
2003
Porvoo Kilpilahti Repair of Dock 1 Grounding of Docks 2 and 3 Inspections of Docks 1,2,3,4 and 8. jacketing, water jet cutting of piles of Dock 4. Survey of freshwater basin Poralauta Esko. (Finnish Maritime Administration,) Oulu, Taskila waterworks. Drying and inspection of sewer pipe. Sundsvall, Sweden. Dismantling of underwater support beams of new dock.
2002
Kemi, Isohaara power plant. repair of suction floor Naantali, Nesteoil, covering of dock piles with protective concrete Repair of lower walls Harjavalta power plant Porvoo, Checking the grounding of Kilpilahti dock 2 and 3
2001
Repair of upper wall of power plant of Harjavalta Särkisalo. Quarry of channel of embankment bridge Savonlinna, dismantling of ship guides
2000
Rymättylä, Repair of bridge support 3 of Kirveenrauma Padasjoki, Underwater quarry of Laivaranta Porvoo. Kilpilati water pipes dock 2 and 8 Åland Sweden, sea cable between Telholm and Sandvik Rauma. Erosion slab of Isohakunin RO-RO 7 dock Porvoo, Kilpilahti docks 1, 4 and 8 study.
1999
Åland, New dock Långnäs. (19981999) Hanko, Ro-Ro of Nuottasaari Installation of dock elements Deepening of bottom of area in front of dock Pouring of erosion slab. Varkaus, Pouring of erosion slab of Taipale harbor.
1998
Borstö, St.Mikael project. Turku, Study of eastern shore dock of Aurajoki. Tallinn, Repair of retaining wall of passenger harbor retaining wall. Tallinn, Study and survey of Muga harbor.
1997
Porvoo, Kilpilahti dock 2 and 3 water jet cutting and jacketing. Pansio, Junalauttasatama (1997-1998)